S-2.1, r. 4 - Safety Code for the construction industry

Full text
7.5.1. (Replaced).
O.C. 329-94, s. 73; O.C. 483-2021, s. 9.
7.5.1. When it is not in use, any low velocity explosive actuated tool shall be placed in a case designed for that purpose. The case shall contain:
(1)  a copy of the manufacturer’s instructions for the use and maintenance of the tool;
(2)  all the accessories and implements necessary for maintenance of the tool at the work site;
(3)  a logbook recording the date of each inspection provided for in subparagraph b of paragraph 1 of section 7.4.1 as well as the date and type of each repair made.
O.C. 329-94, s. 73.